Bardin Gousserey stadium
Description
Inaugurated in September 2019, the 400-metre track at the Bardin Gousserey stadium is a real lever for regional planning. Consisting of 6 ring corridors and 8 straight lines, it benefits from a modern and quality night lighting. The layouts of the component allow the practice of different disciplines such as throws (weight, disc, hammer, javelin), jumps (height, pole, triple jumps, length) and different races. This track is waterproof and its resin is red, the gray color on the dead zones give the whole a real cachet. A 660-seat platform under which there are many changing rooms for the comfort of the athletes gives the whole a real desire to perform in a green setting.