travaux-colombiere-epinal-24-08-2020-14
  • Games Preparation Centers

Colombière Stadium

Commune d'Epinal
Épinal Grand Est
Altitude: 315 meters
1 Stadium

Center's disciplines

  • Athletics

Description

It is a place dedicated to the practice of athletics, renovated and rehabilitated in 2020. From changing the lawn to installing an 8-lane track unique in the department, including the creation of a training track on the annex stadium, the extension of the honor stand, the complete repair of the landscaped stand and the renovation of the changing rooms, the work carried out by the Epinal agglomeration community for nearly 3 million euros euros were used to restore color and bring up to standard a site that had not been renovated since 1984.

The site is made up of two racing rings, including that of the main stadium, with official dimensions, 8 lanes, was inaugurated in 2020. It has pole vault, long jump, high jump areas, arranged in a to be able to practice whatever the direction of the wind. It also has areas for throwing weight, javelins, hammers and discs.

The second 350-meter track of the annex stadium also has jumping and throwing areas, this area was created in 2019. It is in direct connection with the Vosges forests and its varied mountain bike routes.

Special features

Brand new 8-lane track

2 racing rings

Timing lap

Known for

World Combined Ultra-Event Championships in Track and Field: August 2021

National athletics meeting: September 2020

Options in this center

  • Internet access
  • Meeting room
  • Salle de visionnage vidéo
  • Infirmery
  • Physiotherapy room
  • Equipment available for private use
  • Secure storage area
  • Personal security service
  • Floodlit facilities
  • Vehicle hire service
  • Adapted vehicle hire service
  • Hospital nearby